top of page
00.jpg

1 Clayton Mews, SE10 8HZ

London, UK I 2021
Çapa 1

Statue

Office Work

Scope of Work

  • Site Survey

  • Digital Modeling (BIM in Archicad)

  • Documentation (Preparation of views of the existing situation)

UK Map_01.jpg

1 Clayton Mews, SE10 8HZ

The project is the creation of a digital model of the 2-story building and its rear garden by making on-site measurements.

On-site measurements of the building were made and converted into a BIM model. The modeling process was carried out at the LOD4 level of the BIM. 

 

After the complementation of the model, the documentation (plans, sections, elevations, etc) of the BIM Model that showing the existing situation of the building was prepared.

  • Gri LinkedIn Simge
  • Gri Instagram Simge
  • Gri Heyecan Simge
  • issuu
bottom of page